4,000+ Metalworking Project Plans Ready to Build and Sell
Sliding gates, security gates, window grilles, railings, work benches, shelving, utility trailers, braai stands and much more.
Pick a project → check the measurements → fabricate → sell.

It is not a course and there are no lessons to sit through. It is a digital library of more than 4,000 tested project plans, with measurements, material lists, cost estimates, suggested selling prices and estimated profit. Instant access so you can start fabricating today.
Pay securely by Card (ZAR), Capitec Pay, Apple Pay or EFT
Secure payment · instant access
Does this happen in your workshop?
You graft every single day… and the profit never comes.
You lose hours drawing
You end up drawing from scratch on paper or on the computer, when you could already be cutting and welding.
Measuring mistakes that cost you dearly
One measurement taken wrong and you lose the material, the time and the profit. And off you go to buy steel all over again.
You quote by eye and lose money
Without knowing your real cost or your selling price, you end up giving your work away and barely any profit is left.
You lose customers by being slow
While you are still drawing, the customer has already gone to the competition who showed them the design on the spot.
The problem is not a lack of work. It is not having the right plan on hand when the customer walks in.
What is The Fabricator's Vault™?
Never run out of ideas for your next job. Get instant access to a complete library of ready-to-build metal fabrication projects and turn your skills into profitable work.
It is a digital library with 4,000+ metalworking project plans organised by category: sliding gates, security gates, window grilles, industrial furniture, utility trailers, steel structures, sheds, staircases, railings and much more.
Every project includes everything you need to fabricate it and sell it: exact measurements, cutting list, material list, profile type and thickness, production cost, suggested selling price and estimated profit.
Open the plan on your phone, copy the measurements, build it and sell it. Simple as that.

Pay securely by Card (ZAR), Capitec Pay, Apple Pay or EFT
Secure payment · instant access
See some of the projects inside
4,000+ ready-to-build plans: gates, industrial furniture, utility trailers, steel structures, sheds and much more.




















What does every project include?
Everything you need to open the file, fabricate the piece and sell it at a profit. Without wasting time drawing or calculating.
- Exact measurements for every part
- Complete material list
- Detailed cutting list
- Recommended profile type and thickness
- Step-by-step build sequence
- Average production cost
- Suggested selling price
- Estimated profit per piece
4 bonuses included
Included at no extra cost when you secure your Fabricator's Vault

BONUS 1
Guide to presenting steel tube furniture

BONUS 2
Complete pricing guide for industrial furniture

BONUS 3
The 10 biggest mistakes of a beginner welder

BONUS 4
Types of steel and their applications
What changes in your workshop
Less time wasted. More pieces built. More money in your pocket.
You build a lot faster
Open the plan, copy the measurements, cut and assemble. No time lost thinking or drawing.
You quote with confidence
Material cost, suggested selling price and estimated profit on every project. No more quoting by eye.
Your workshop properly organised
4,000+ plans sorted by category: gates, furniture, trailers, structures and much more.
More ideas to sell
Show the customer a finished design and close the deal on the spot. Without keeping them waiting.
What buyers are saying:
“I have already built more than 30 projects from the vault. The best sellers are the gates and the window grilles. First class material!”

Carlos Gutiérrez
Buenos Aires, Argentina
“The best investment I have made. The plans come with everything: measurements, materials, cost. You just build it and sell it.”

Miguel Hernández
Mexico City, Mexico
“I had no idea what to build. With the vault I started making staircases and railings. My turnover tripled!”

Andrés Ramírez
Bogotá, Colombia
Get your vault and start today
One-time payment · Instant digital access · No monthly fees
This offer ends in
44:59 min

Professional Kit
R597
Today only!
only R97
One-time payment · No monthly fees
💳 Pay in Rand by Card, Capitec Pay, Apple Pay or EFT
- 4,000+ complete metalworking project plans
- 300 sliding gate, security gate and window grille plans
- Small and large utility trailer plans
- Platform and tow-trailer plans
- Vehicle and body-building plans
- 600 industrial furniture plans
- 500 steel structure and shed plans
- 50 braai and fire pit plans
- 100 gym equipment plans
- Measurements, cutting lists, materials, cost and suggested selling price
- BONUS 1: Guide to presenting steel tube furniture
- BONUS 2: Complete pricing guide for industrial furniture
- BONUS 3: The 10 biggest mistakes of a beginner welder
- BONUS 4: Types of steel and their applications
- Instant and lifetime digital access
Pay securely by Card (ZAR), Capitec Pay, Apple Pay or EFT
Secure payment · instant access
Instant digital access by email
30-Day Money-Back Guarantee
Try The Fabricator's Vault risk-free for 30 days. If you feel it is not for you, request a refund by email and we give you back 100% of your money. No questions and no red tape. The risk is all ours.